Category > Trains

Progress in Manhattan underground rail link

Jon » 21 July 2008 » In Trains, Transportation, Tubes, Tunnels, procurement, underground systems » 1 Comment

MTA Tunnel Progress - East Side Access - as of June, 2008

MTA Tunnel Progress - East Side Access - as of June, 2008

New York City’s Metropolitan Transportation Authority (MTA) has announced great progress in its “East Side Access” project. In less than a year - two tunnel boring machines have dug tunnels of 5,421 feet and 3,705 feet. The longer tunnel is over a mile long - and by public-works standards, that seems pretty fast. Worth remembering if we need to build shelters, or more mass transit, or pneumatic mail or package delivery systems. The Times has a brilliant 360-degree panoramic image by Raymond McCrea Jones and Gabriel Dance, and other outstanding still images by Ozier Muhammad. From the Times’ print coverage by William Neuman 19 Stories Below Manhattan, a 640-Ton Machine Drills a New Train Tunnel; note the discrepancy in reported progress between the number provided to Neuman and the figures in the MTA’s diagram, retrieved from their website on 19 July:

“No windshield? Don’t need one,” said the driver (or operator, as he prefers), Anthony Spinoso.

Over several months he has driven the machine 7,700 feet, from a spot deep under Second Avenue and 63rd Street, through the bedrock, to the depths beneath Grand Central Terminal, where the tunnel he has helped dig will someday bring Long Island Rail Road trains to the East Side of Manhattan.

Now he is backing the machine up several hundred feet to a point where it will begin boring a parallel tunnel. Another thing that Mr. Spinoso does not have is a steering wheel. Instead, he guides the movement of the machine with buttons in front of him, striving to hold a green dot (his machine) on the computer screen at the center of a narrow yellow line that represents his programmed course. He must keep the 22-foot-tall, 360-foot-long behemoth on track without varying more than 2 inches in any direction.

“You just push the buttons, it’s like a video game,” said Edward Kennedy, an engineer helping to supervise the work. “The guy has a screen with a yellow line on it, the yellow brick road. All he has to do is keep on the yellow brick road.”

The digging began last fall for the new Long Island Rail Road tunnels - there will ultimately be eight tunnel sections feeding into an immense new station below Grand Central. There are two machines working simultaneously on separate tunnel sections (the second one, which started later, has reached 48th Street). They can cut through 100 feet of rock a day but often move much slower. The tunneling and the excavation of a huge cavern under Grand Central to house the new station are expected to be completed in 2012, but the entire project will not be finished until at least 2015.

The boring is being done for the Metropolitan Transportation Authority by Dragados Judlau, a joint venture of large construction firms. The cost of the tunneling is $428 million, but the entire project, which includes building out the station and laying the tracks, is expected to cost $7.2 billion. The new tunnels will connect to an existing tunnel under the East River and from there (via more tunneling) to Long Island Rail Road tracks in Queens.

[Emphasis (bold/red) supplied.]

Cf. data in MTA diagram, supra; the two subtotals in the MTA diagram total, according to our calculations, 9,126 feet. This may be no more than a minor error, or a question of dating - as the general progress seems swift, at least by New York standards. (Note that, nearly seven years after the 9/11 attacks, we’ve not agreed on a plan, much less completed one).

Other Resources:

MTA Capital Construction - East Side Access

Wikipedia entry on MTA East Side Access project

Continue reading...

Tags: , , , ,

Shanghai maglev train runs at 268 mph

Jon » 16 June 2008 » In Trains, Transportation » No Comments

Inside Transit has a report and images of the new Shanghai maglev train. (AMTRAK, Washington D.C. to New Yor runs at  peak speed, 200 mph, for only a few minutes - in effect a novelty or a capability demonstration).  Check out the post on Inside Transit here. Shanghai Maglev train - image via InsideTransit.com

Continue reading...

Tags: , ,

Inhabitat: top 5 cities for mass transportation

Jon » 02 October 2007 » In GreenTechnology, Trains, Transportation, underground systems » No Comments

Inhabitat posts today its Transportation Tuesday: top 10 cities for public transit:

Just because we’re in the top 5 -  doesn’t mean we shouldn’t be doing more.

Continue reading...

Japan’s new bullet train: tiny bit faster - 19% less energy

Jon » 13 September 2007 » In Auto Industry, Trains, Transportation » No Comments

From “Speeding Bullet World’s Fastest Train You Can Ride Dumps Energy Like a Prius ,” by Alex Hutchinson in Popular Mechanics:

When the latest model of Shinkansen, the Japanese bullet train, was launched on July 1, more than 1300 people showed up at 6 am on a Sunday to pack the seats for the maiden voyage, from Tokyo to Fukuoka. The Series N700 is billed by Japan Railways as the world’s fastest bullet train in service (France’s faster TGV train has been used only to break speed records), with a top speed of 186 mph.
photograph-by-ren-zhenglai-xinhua-wpn-via-popular-mechanics-medium.jpg
It’s the first bullet train to be equipped with an air spring-powered active tilting system, allowing it to whip around corners without slowing down. Special fabric hoods cover the gaps between cars, turning the train into one long, seamless, aerodynamic unit.

Despite all these improvements, the 5-hour trip to Fukuoka will be shortened by a mere 10 minutes. More important, though, the journey will be quieter and more comfortable, and it will use 19 percent less energy than current bullet trains.

(emphasis added)

Please bear this in mind the next time someone refers to the United States as the most technologically advanced country in the world.

Continue reading...

FireStats icon Powered by FireStats